請(qǐng)購文件;請(qǐng)購單 | | requisition (package) ; requisition documents |
采購規(guī)格書;采購說明書 | | purchasing specification [PS] |
投標(biāo)者須知;報(bào)價(jià)須知 | | instructions to bidders [ITB] |
變更 | | change |
用戶變更;合同變更 | | client change ;contract change |
待定的用戶變更 | | pending client change |
認(rèn)可的用戶變更 | | approved client change |
用戶變更(通知)單;合同變更(通知)單 | | client change notice [CCB] ; contract change order [CCO] |
項(xiàng)目變更;內(nèi)部變更 | | project change ; internal change |
項(xiàng)目變更(通知)單;內(nèi)部變更(通知)單 | | project change notice [PCN] ;internal change order [ICO] |
變更申請(qǐng)單;偏差通知單 | | change request ; deviation notice [DN] |
質(zhì)量 | | quality |
質(zhì)量方針 | | quality policy |
質(zhì)量管理 | | quality management |
質(zhì)量策劃 | | quality planning |
質(zhì)量控制 | | quality control [QC] |
質(zhì)量保證 | | quality assurance [QA] |
質(zhì)量體系 | | quality system |
質(zhì)量改進(jìn) | | quality improvement |
質(zhì)量手冊(cè) | | quality manual |
質(zhì)量計(jì)劃 | | quality plan |
圖紙 | | drawing |
工藝流程圖 | | process flow diagram [PFD] |
工藝控制圖 | | process control diagram [PCD] |
管道儀表流程圖 | | piping and instrument diagram [PID] [P&ID] |
裝置布置圖 | | plot plan |
管道平面設(shè)計(jì)圖 | | piping planning (drawing) |
管道平面布置圖 | | piping layout drawing |
管段圖;管道空視圖 | | isometric drawing |
"批準(zhǔn)用于詳細(xì)工程設(shè)計(jì)"圖紙 | | drawing issued "Approved for Design" [AFD] |
"批準(zhǔn)用于施工"圖紙 | | drawings issued "Approved for construction" [AFC] |
供貨廠商先期確認(rèn)圖(紙) | | advanced certified final drawings [ACF] ; advanced certified vendors' drawings ; preliminary vendor drawings [PD] |
供貨廠商最終確認(rèn)圖(紙) | | certified final drawings [CF] ; certified vendor drawings[CD] |
圖表 | | diagram ; chart |
直方圖 | | histogram |
橫道圖 | | bar ; bar-chart ; Gantt chart |
進(jìn)度趨勢(shì)展示圖 | | schedule trend display chart |
費(fèi)用趨勢(shì)展示圖 | | cost trend display chart |
項(xiàng)目;工程項(xiàng)目 | | project |
項(xiàng)目實(shí)施費(fèi)用狀態(tài)報(bào)告 | | project execution |
項(xiàng)目實(shí)施階段 | | project phase |
項(xiàng)目初始階段 | | initial phase of project execution |
施工階段 | | construction phase |
開車階段 | | start-up phase |
項(xiàng)目建設(shè)周期 | | project duration's |
項(xiàng)目管理 | | project management |
項(xiàng)目控制 | | project control |
項(xiàng)目組 | | project team |
專責(zé)項(xiàng)目組 | | task force |
項(xiàng)目經(jīng)理 | | project manager [PM] |
項(xiàng)目設(shè)計(jì)經(jīng)理 | | project engineering manager [PEM] |
項(xiàng)目采購經(jīng)理 | | project procurement manager [PPM] |
項(xiàng)目施工經(jīng)理 | | project construction manager [PCM] |
項(xiàng)目工藝經(jīng)理 | | project process manager |
項(xiàng)目控制經(jīng)理 | | project controls manager |
項(xiàng)目進(jìn)度計(jì)劃工程師 | | project scheduling engineer ; project scheduler |
項(xiàng)目估算師 | | project estimator |
項(xiàng)目費(fèi)用控制工程師 | | project cost control engineer ; project cost engineer |
項(xiàng)目材料控制工程師 | | project material control engineer |
項(xiàng)目財(cái)務(wù)經(jīng)理 | | project financial manager |
項(xiàng)目質(zhì)量經(jīng)理 | | project quality manager |
項(xiàng)目開車經(jīng)理 | | project start-up manager |
項(xiàng)目安全工程師 | | project safety engineer |
項(xiàng)目秘書 | | project secretary |
項(xiàng)目控制手段 | | project controlling ; tools for project control |
控制基準(zhǔn);執(zhí)行效果測(cè)量基準(zhǔn);實(shí)物進(jìn)度基準(zhǔn) | | control baseline ; performance measurement baseline ; progress baseline |
偏差;差異 | | deviation ; variance |
執(zhí)行效果;效績(jī);性能 | | performance |
跟蹤 | | tracking ; follow up |
監(jiān)控 | | monitoring |
趨勢(shì)分析;趨勢(shì)預(yù)測(cè) | | trending ; trend projection |
偏差預(yù)測(cè)值 | | projected deviations |
預(yù)測(cè) | | projection ; forecasting |
糾正措施 | | corrective action ; corrective measures |
項(xiàng)目綜合控制 | | integrated project control |
贏得值原理 | | earned value concept [EVC] |
計(jì)劃工作量的預(yù)算費(fèi)用 | | budgeted cost for work scheduled [BCWS] |
已完工作量的預(yù)算費(fèi)用 | | budgeted cost for work performed [BCWP] |
已完工作量的實(shí)耗費(fèi)用 | | actual cost for work performed [ACWP] |
費(fèi)用差異 | | cost variance [CV] |
進(jìn)度差異 | | schedule variance [SV] |
費(fèi)用指數(shù) | | cost index [CI] |
進(jìn)度指數(shù) | | schedule index [SI] |
費(fèi)用執(zhí)行效果指數(shù) | | cost performance index [CPI] |
進(jìn)度執(zhí)行效果指數(shù) | | schedule performance index [SPI] |
竣工差異 | | at completion variance [ACV] |
竣工預(yù)算費(fèi)用 | | budgeted cost at completion [BAC] |
竣工預(yù)測(cè)費(fèi)用 | | estimated cost at completion [EAC] |
費(fèi)用;成本 | | cost |
建設(shè)總費(fèi)用 | | total installed cost [TIC] |
材料費(fèi)用;直接材料費(fèi)用 | | material cost ; direct material cost |
設(shè)備費(fèi)用;設(shè)備購買費(fèi)用 | | equipment cost ; purchased cost of equipment |
散裝材料費(fèi)用;散裝材料購買費(fèi)用 | | bulk materials cost ; purchased cost of bulk materials ; commodities cost |
(直接)材料相關(guān)費(fèi)用(運(yùn)費(fèi)和保險(xiǎn)費(fèi)等) | | cost of material related freight ; insurance , etc. |
施工費(fèi)用 | | construction cost |
施工人工費(fèi)用;施工勞力費(fèi)用 | | labor cost ; erection labor cost ; construction force cost |
設(shè)備安裝人工費(fèi)用 | | labor cost associated with equipment |
散裝材料施工人工費(fèi)用 | | labor cost associated with bulk materials |
人工時(shí)估算定額;施工人工時(shí)估算定額;標(biāo)準(zhǔn)工時(shí)定額 | | standard man-hours ; standard labor man-hours ; standard construction man-hours ; standard hours |
勞動(dòng)生產(chǎn)率;勞動(dòng)生產(chǎn)率系數(shù) | | labor productivity ; productivity factor ; productivity ratio |
修正的人工事估算值 | | adjusted man-hours |
人工時(shí)單價(jià) | | man-hour rate |
施工監(jiān)督費(fèi)用;施工監(jiān)督和管理費(fèi)用 | | cost of construction supervision ; cost of construction management and supervision ; field administration and direct supervision cost [FADS] |
施工間接費(fèi)用 | | cost of construction indirect |
分包合同費(fèi)用;現(xiàn)場(chǎng)施工分包合同費(fèi)用 | | subcontract cost ; field subcontract cost |
公司本部(服務(wù))費(fèi)用 | | home office cost ; cost of home office servers |
公司管理費(fèi) | | overhead ; home office overheads |
非工資費(fèi)用 | | non-payroll ; home-office expenses |
試車費(fèi)用 | | commissioning activities cost |
投料試車費(fèi)用 | | start-up cost |
其他費(fèi)用 | | other costs |
利潤(rùn);預(yù)期利潤(rùn) | | profit ; expected profit |
服務(wù)酬金 | | service gains |
內(nèi)部費(fèi)用轉(zhuǎn)換 | | internal transfer |
認(rèn)可的預(yù)計(jì)費(fèi)用 | | anticipated approved cost |
費(fèi)用控制;成本控制 | | cost control |
預(yù)算(值);項(xiàng)目控制預(yù)算 | | budget ; project control budget |
預(yù)算結(jié)余(值);費(fèi)用結(jié)余(值) | | under-run ; cost under-run |
預(yù)算超支(值);費(fèi)用超支(值) | | over-run ; cost over-run |
施工 | | construction |
施工工種 | | construction craft |
試車準(zhǔn)備 | | precommissioning |
機(jī)械竣工 | | mechanical completion [MC] |
界區(qū) | | battery limit [BL] |
工藝界區(qū) | | process battery limit ; inside battery limit [ISBL] |
界外設(shè)施區(qū);輔助設(shè)施界區(qū) | | offsite battery limit [OSBL] |
工藝裝置 | | process section ; process unit |
界外設(shè)施;輔助設(shè)施;通用設(shè)施 | | offsite section ; offsite unit ; offsite facilities ; general facilities |
保證;擔(dān)保 | | guarantee ; warranty |
性能保證 | | performance guarantees |
絕對(duì)保證 | | absolute guarantees |
違約罰款保證 | | penaltiable guarantees |
工作質(zhì)量保證 | | workmanship guarantees |
機(jī)械保證;機(jī)械擔(dān)保 | | mechanical guarantees ; mechanical warranties |
保函;擔(dān)保(書) | | bond |
投標(biāo)保函 | | bid bond |
履約保函;履約擔(dān)保(書);為履約出具的銀行保證書 | | performance bond ; performance bank guarantee |
預(yù)付款保函;為預(yù)付款出具的銀行保證書 | | advance payment bond ; bank guarantee for advance payment |
保證書;保險(xiǎn)公司出具的保函 | | surety bond |
銀行保證書;信用保證書 | | bank guarantee ; letter of guarantee [L/G] |
安慰信 | | letter of comfort |
保密協(xié)議 | | secrecy agreement |
保險(xiǎn) | | insurance ; assurance |
保險(xiǎn)單 | | insurance policy |
保險(xiǎn)證書 | | insurance certificate |
保險(xiǎn)費(fèi) | | insurance premium |
保稅貨物 | | bonded goods |
保稅倉庫 | | bonded warehouse |
信用證 | | letter of credit [L/C] |
不可撤銷信用證 | | irrevocable L/C |
可撤銷信用證 | | revocable L/C |
即期信用證 | | sight credit ; sight L/C |
遠(yuǎn)期信用證 | | term credit ; term L/C |
保兌信用證 | | confirmed L/C |
可轉(zhuǎn)讓信用證 | | transferable L/C |
備用信用證 | | stand-by L/C |
信用證提款 | | drawing on L/Cs |
信貸 | | CREDIT |
賣方信貸 | | SUPPLIER'S CREDIT [S/C] |
買方信貸 | | buyer's credit [B/C] |
信貸額度 | | line of credit |
項(xiàng)目融資;工程項(xiàng)目籌資 | | project finance |
貸款 | | loan |
即期貸款 | | demand loan |
索賠 | | claim ; claim indemnity |
培訓(xùn) | | training |
稅;稅金 | | tax(es) |
所得稅 | | income taxes |
關(guān)稅 | | duties |
合法避稅 | | tax avoidance |
程序 | | procedure |
項(xiàng)目協(xié)調(diào)程序 | | project coordination procedure |
項(xiàng)目實(shí)施程序 | | project execution procedure |
項(xiàng)目設(shè)計(jì)程序 | | project engineering procedure |
項(xiàng)目采購程序 | | project procurement procedure |
項(xiàng)目檢驗(yàn)程序 | | project inspection procedure |
項(xiàng)目控制程序 | | project control procedure |
變更控制程序 | | change control procedure |
預(yù)算變更程序 | | budget change procedure |
項(xiàng)目試車程序;項(xiàng)目開車程序 | | project commissioning procedure ; project start-up procedure ; project test run procedure |
化學(xué)清洗程序 | | chemical cleaning procedure |
性能考核程序;生產(chǎn)考核程序 | | performance test run procedure ; performance guarantee test procedure |
裝置驗(yàn)收程序 | | plant acceptance procedure |
數(shù)據(jù) | | data |
條件數(shù)據(jù);設(shè)計(jì)條件 | | supporting data |
返回的條件數(shù)據(jù);返回的設(shè)計(jì)條件 | | resultant feedback of data |
意向書 | | letter of intent |