The experiments were carried out as following,
  Dry air and water are mixed and pump to a 65m long,50.8mmdiameter horizontal steel pipeline connected to a 35 m long ,50.8mm diameterPerspex pipeline which is inclined to -2.54 degree from horizontal , followedby a 15.5 m high ,45mm vertical PVC riser operating at atmospheric endpressure.

Recently , I tryto develop models with multiple tab files and network as following,
Pro#1 I am notsure whether the fluid properties in mix pipeline are assigned correctly.

The model is similar to what I want to develop. Whatmethod should be used to assign fluid properties mixed with the two Wells here?

Pro#2 The modelcan run in steady state.But there is a warning below.
Do you think whatis the protential problem here? I can’t get result of slug flow, it showsstratified flow and annular flow in the ID profile.

Pro#3 The model can’t run in transientstate with error below.
If it is purecomposition H2O, the property curve is good. But fluid tab file of purecomponent CAN NOT be generated in PVTsim.
If othercomponent is added to water, the property curve is incorrect as it shown below.
How do you solvethis kind of problem?